This was a complete retrofit of an entire building’s controls system. We upgraded their now-obsolete controls system to a much more efficient and user friendly interface, while also giving them remote accessibility.
This project consisted of a new addition to an existing adhesive manufacturer’s plant – we were utilized to design and install the HVAC systems, as well as the process piping and equipment for their new production line.